About this Project
TG Gallagher’s Service Division has been responsible for maintaining and servicing facilities for a top-tier medical school in Boston. This particular project involved an upgrade of the campus’s chilled water system. The team serviced the existing chilled water strainers and integrated new ones to increase the system’s cooling efficiency.
TGG showcased its proficiency in prefabrication, crafting various valve, strainer, and piping assemblies. Given the intricate nature of the installations, many systems required chilled water and drain shutdowns.
The team undertook extended, uninterrupted shifts, ensuring the building’s chilled water system resumed operations swiftly, minimizing disruptions to classes and critical experiments while maintaining safety protocols.