Skip to Main Content
  • Location Boston, MA
  • Vertical Higher Education
  • Capability Service
  • Delivery Method Mechanical Prime

The Service Division delivered enhanced cooling efficiency and promptly revamped a top medical school's chilled water system with minimal disruptions to daily activities.


About this Project

TG Gallagher’s Service Division has been responsible for maintaining and servicing facilities for a top-tier medical school in Boston. This particular project involved an upgrade of the campus’s chilled water system. The team serviced the existing chilled water strainers and integrated new ones to increase the system’s cooling efficiency.

TGG showcased its proficiency in prefabrication, crafting various valve, strainer, and piping assemblies. Given the intricate nature of the installations, many systems required chilled water and drain shutdowns.

The team undertook extended, uninterrupted shifts, ensuring the building’s chilled water system resumed operations swiftly, minimizing disruptions to classes and critical experiments while maintaining safety protocols.

In Collaboration With

  • Owner Medical School in Boston, MA